Grace's Guide To British Industrial History

Registered UK Charity (No. 115342)

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 162,253 pages of information and 244,496 images on early companies, their products and the people who designed and built them.

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 147,919 pages of information and 233,587 images on early companies, their products and the people who designed and built them.

Difference between revisions of "Wood Lane Power Station"

From Graces Guide
Line 3: Line 3:
1900 Power station began operation.  It was the earliest example of high voltage (c.5kV), three phase current generation and transmission in the UK.  The supply cables were manufactured by the [[British Insulated Wire Co]]; the Wood Lane installation was the first recorded example of their use in England for three phase transmission<ref>Wood Lane History [http://www.woodlanebicc.co.uk/docs/chapter%20two.pdf]</ref>
1900 Power station began operation.  It was the earliest example of high voltage (c.5kV), three phase current generation and transmission in the UK.  The supply cables were manufactured by the [[British Insulated Wire Co]]; the Wood Lane installation was the first recorded example of their use in England for three phase transmission<ref>Wood Lane History [http://www.woodlanebicc.co.uk/docs/chapter%20two.pdf]</ref>


1923 The [[London Power Co|London Electricity Joint Committee]] acquired the [[Wood Lane Power Station|Wood Lane, Shepherd's Bush generating station]] and main transmission lines from [[Kensington and Knightsbridge Electric Supply Co|Kensington and Knightsbridge Electric Lighting Co]] and [[Notting Hill Electric Light Co|Notting Hill Electric Light Co]] <ref>The Times, Oct 16, 1928</ref>.
1923 The [[London Power Co|London Electricity Joint Committee]] acquired the [[Wood Lane Power Station|Wood Lane, Shepherd's Bush generating station]] and main transmission lines from [[Kensington and Knightsbridge Electric Lighting Co]] and [[Notting Hill Electric Light Co|Notting Hill Electric Light Co]] <ref>The Times, Oct 16, 1928</ref>.


==See Also==
==See Also==

Revision as of 10:30, 29 May 2020

1899 Kensington and Knightsbridge Electric Lighting Co and Notting Hill Electric Light Co started construction of the power station in Wood Lane

1900 Power station began operation. It was the earliest example of high voltage (c.5kV), three phase current generation and transmission in the UK. The supply cables were manufactured by the British Insulated Wire Co; the Wood Lane installation was the first recorded example of their use in England for three phase transmission[1]

1923 The London Electricity Joint Committee acquired the Wood Lane, Shepherd's Bush generating station and main transmission lines from Kensington and Knightsbridge Electric Lighting Co and Notting Hill Electric Light Co [2].

See Also

Loading...

Sources of Information

  1. Wood Lane History [1]
  2. The Times, Oct 16, 1928