Difference between revisions of "Waring Brothers and Hunt"
Line 7: | Line 7: | ||
1868 Contract at Jabalpur completed. | 1868 Contract at Jabalpur completed. | ||
Completed the Jubbulpore extension of the [[East Indian Railway]] under their chief engineer [[Henry Peveril Le Mesurier]]<ref>Building the Railways of the Raj 1850-1900 by Ian J. Kerr</ref> (Is this correct? His brother [Charles Benjamin Le Mesurier]] was the engineer of that Railway). | Completed the Jubbulpore extension of the [[East Indian Railway]] under their chief engineer [[Henry Peveril Le Mesurier]]<ref>Building the Railways of the Raj 1850-1900 by Ian J. Kerr</ref> (Is this correct? His brother [[Charles Benjamin Le Mesurier]] was the engineer of that Railway). | ||
Latest revision as of 09:43, 10 May 2017
Railway contractors - see Waring Brothers and James Hunt
1863 Constructed the Jabalpur (Jubbulpore ?) branch of the East Indian Railway, from Allahabad to Jabalpur, a distance of 222 miles.
1866 Surveyed a line for the Indus Valley Railway
1868 Contract at Jabalpur completed.
Completed the Jubbulpore extension of the East Indian Railway under their chief engineer Henry Peveril Le Mesurier[1] (Is this correct? His brother Charles Benjamin Le Mesurier was the engineer of that Railway).
See Also
Sources of Information
- ↑ Building the Railways of the Raj 1850-1900 by Ian J. Kerr