Difference between revisions of "Pyrmont Bridge, Sydney"
Line 5: | Line 5: | ||
[[Image:Im201403A-Pyr.jpg|thumb| ]] | [[Image:Im201403A-Pyr.jpg|thumb| ]] | ||
[[Image:Im201403A-Pyr4.jpg|thumb| ]] | [[Image:Im201403A-Pyr4.jpg|thumb| ]] | ||
[[Image:JD 2007 Pyrmont02.jpg|thumb| ]] | |||
[[Image:JD 2007 Pyrmont03.jpg|thumb| ]] | |||
[[Image:JD 2007 Pyrmont04.jpg|thumb| ]] | |||
Built 1899-1902 | Built 1899-1902 | ||
Latest revision as of 19:07, 22 February 2018
Built 1899-1902
The first electrically-powered swing bridge.
Percy Allan was the Engineer, with assistants J. J. C. Bradfield and Gordon Edgell
The contractors for the steelwork were S.A. des Ateliers de Construction de Hal, of Hal, near Brussels, Belgium. [1]
The bridge was described in great detail in 'The Engineer' 1917 (26 January, 2, 9 & 12 February).
See Also
Sources of Information
- ↑ The Engineer, 16 Feb 1917