Great Western and Brentford Railway
Sanctioned in 1855.
It was opened on July 18th 1859, extending from Southall to docks to be built at Brentford.
It was transferred the the Great Western Railway in 1865.[1]
See Also
Sources of Information
- ↑ The Engineer 1924/10/17