Difference between revisions of "County of Durham Electric Power Supply Co"
(Created page with "1906 Powers to operate the company's generating station at Gateshead were transferred to the Newcastle-upon-Tyne Electric Supply Co<ref>The London Gazette 24 November 19...") |
|||
Line 1: | Line 1: | ||
1906 Powers to operate the company's generating station at Gateshead were transferred to the [[Newcastle-upon-Tyne Electric Supply Co]]<ref>The London Gazette 24 November 1905</ref> | 1906 Powers to operate the company's generating station at Gateshead were transferred to the [[Newcastle-upon-Tyne Electric Supply Co]]<ref>The London Gazette 24 November 1905</ref> | ||
==See Also== | |||
<what-links-here/> | |||
==Sources of Information== | |||
<references/> | |||
{{DEFAULTSORT: }} | |||
[[Category: Town - Gateshead]] | |||
[[Category: Electricity Generation & Supply]] |
Revision as of 11:07, 1 August 2021
1906 Powers to operate the company's generating station at Gateshead were transferred to the Newcastle-upon-Tyne Electric Supply Co[1]
See Also
Sources of Information
- ↑ The London Gazette 24 November 1905