2023. Top of chimney, now a sewer ventilation tower

1860s: The main line of the sewer forming the Metropolitan Board of Works's western division drainage scheme, about 3.25 miles in length, ran from Chiswick-mall, passed close to the river and then along the Fulham Road and Walham Green, to Cremorne Gardens. Initially, the sewage was lifted by a temporary pumping station at this point.

1875 The line was later extended to the permanent pumping station near the Grosvenor Canal, the Western Pumping Station.

Bazalgette’s sewer was too high to pass under the nearby Grosvenor Canal, and the Western Pumping Station lifts the wastewater to around 18 feet, where gravity keeps the flow strong enough that the brick sewer chamber is self-cleaning.

Four high-pressure condensing beam-engines, developing 360 hp in total raised sewage and storm water by 18 feet (5.5 m) from a low level sewer, to pump it to the Abbey Mills station at Barking. The station could pump 55 million gallons per day, and a backup non-condensing 120 HP engine was provided in case of failure of any of the main engines.[1]

From 1937 the pumping duty was taken over by four 600-horsepower W. H. Allen, Sons and Co diesel engines, and three pumps driven by electric motors to lift flows during dry weather.[2]. Three of the diesel engines remain in service.

The 172 ft chimney is now used as a sewer vent.

If the sewer downstream from Western was unable to take the flow pumped by the engines, wastewater was released into the Thames. This will no longer be the case when the 'Super Sewer' - the Thames Tideway Tunnel - is completed.

Information from the Allen Engineering Review, published in 1939 by W. H. Allen, Sons and Co [3]

'... the contract for the pumping machinery was placed with Messrs. James Watt & Co., of Soho, Birmingham, for a sum of £57,000. The original machinery consisted of four pumping engines, each of 90 b.h.p., double-acting, high-pressure, condensing beam engines, standing back to back in pairs in the main engine house, single cylinder machines, each driving a pair of single-acting pumps with plungers 5ft. 34ins. in diameter and a stroke of 4ft. An auxiliary engine was also installed, a horizontal machine, rated at 74 b.h.p. and driving two single-acting bucket pumps with buckets 48 ins. in diameter and 5ft. stroke, the number of strokes per minute being 9; a reduction gear was used between the pump and the engine with a ratio of 34:1.

'To provide steam for the five pumping engines, ten Cornish boilers were installed, each 6ft. 9ins. in diameter and 22ft. long, with flues 2ft. 9ins. in diameter. Eight of these boilers provided the steam for the four main pumping units, and the remainder were used in conjunction with the emergency unit. The boilers generated steam at a pressure of 35lbs. per square inch, and it is interesting to note that in 1900 the original boilers were replaced by four Lancashire boilers, 8ft. in diameter and 30ft. long, designed for a working pressure of 42lbs. per square inch. The total output of the station with five pumps working was 243 tons per minute.

'An interesting feature in connection with the old engines was that the beams were somewhat unconventional in construction, being built of wrought-iron plates, to which were rivetted cast-iron bosses to carry the various pins. The built-up construction of the beams, we learn, was not entirely successful, and this was mainly due to the fact that machining in those days was not up to the high standard obtainable in modern times, and rivets holding the bosses were apt to work loose. Welding was tried, but this proved unsatisfactory, and finally the trouble was overcome by replacing rivets by fitting bolts. The connecting rods were of cast-iron, the cranks and crankshaft of wrought-iron, and the crankpins of steel. This will interest present-day designers.

'To those who follow with some anxiety the rise and fall in the price of copper, there will be a regret for the good old days when we say that the roof is tiled with solid copper tiles half an inch thick!

'The total capacity of the old station was 243 tons per minute, and the new units, which are erected in the same space occupied by the original engines, have a capacity under normal conditions of 800 tons per minute, with a maximum capacity under low head conditions of 947 tons per minute. ......'. A detailed description of the new installation followed.

See Also

Loading...

Sources of Information

  1. ↑ [1] Edward Walford, 'Pimlico', in Old and New London: Volume 5 (London, 1878), pp. 39-49. British History Online http://www.british-history.ac.uk/old-new-london/vol5/pp39-49 [accessed 26 September 2023]
  2. ↑ [2] Thames Water: Western Pumping Station
  3. ↑ The Allen Engineering Review, No. 1 January 1939: 'A Notable Sewage Pumping Installation for the London County Council', via [3] Public Document & Literature Catalog Accessing Internal Fire digital assets
  • The Engineer 1866/01/12