West Cowes Pier
1861 Proposed
1866 Work commenced. 250 feet long with 60 feet wide landing stage. Architects were Hughes and Bage and the engineer was Alfred Dowson.
1876 Severe storm damage
1882 Remains of pier removed.
1891 New pier proposed. Engineer Frank E. Robinson
