1931 'A highway bridge of exceptional length, height
and span was recently completed across the St.
Lawrence, at Montreal, where the famous Victoria
Bridge, rebuilt in 1898, has long served as a far
from adequate link between the highways which
converge on the city from both sides of the river.
The Victoria bridge, being primarily intended for
railway purposes, has, in fact, very limited roadway accommodation. The inadequacy of the provision for road traffic has long been felt, and has seriously hampered the development of the southern
shore of the river, either for residential or manufacturing purposes. The difficulty, however, of financing
a scheme of the magnitude required was such that it
was not till some six years ago that the Montreal
Harbour Commissioners felt justified in undertaking the work as a toll bridge, which might ultimately earn enough to meet interest and amortisation charges. ..... In January, 1925, the Harbour authority,
aforesaid, commissioned Messrs. Monsarrat and
Pratley, consulting engineers, of Montreal, to
prepare the necessary plans and specifications,
i in association with Mr. J. B. Strauss, of Chicago. .... The main span has, therefore,
been given a length of 1,079 ft. between centres of
piers, which, as the stream is crossed slightly on
the skew, provides a fairway, normal to the
current, 1,000 ft. wide between the wharf side
and the masonry of the river pier. .... Silicon steel was
used for all the
main truss members,
for the flanges of
the floor beams and
most of the bottom
lateral systems. It
was required to have
an ultimate strength
of 80,000 lb. to
90,000 lb. per square
inch, with a yield
point of 45,000 lb.
per square inch,
..... This silicon steel proved to differ
markedly in its characteristics from the carbon
steel, and special care was necessary at the mills
in order to ensure freedom from segregation. It
was found essential to remove by cropping a large
fraction of each ingot. The defects most commonly
encountered during the subsequent working up
of this material were hard spots and pipes, but
thanks to the rigidity of the inspection at the steel
works the total of rejections in the bridge shops
was small. It was much harder on the machinery
than the carbon steel, and when sheared or punched
gave way with a sharp report, and the fracture
was much more crystalline. Owing to these peculiarities, it was found to cost some 25 per cent. to
35 per cent. more to work up than the carbon steel.
On the silicon steel, a working stress of 23,500 lb.
per square inch was adopted for tension members,
whilst in compression members, the permissible
stress was specified to be either 19,000 lb. per square inch. ....'[1]. Continued in Engineering 1931/03/27.