Grace's Guide To British Industrial History

Registered UK Charity (No. 115342)

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 162,258 pages of information and 244,500 images on early companies, their products and the people who designed and built them.

Grace's Guide is the leading source of historical information on industry and manufacturing in Britain. This web publication contains 147,919 pages of information and 233,587 images on early companies, their products and the people who designed and built them.

Manchester, Sheffield and Lincolnshire Railway

From Graces Guide
1877-8.
1880.
1882-3.
1885. Outside Cylinder Express Engine. Charles Sacre, Engineer, Manchester.
1887.
1889. Swing bridge over the River Dee, by F. Fox.
1889. Swing bridge over the River Dee, by F. Fox.
1894.
1894.
1951. No. 2602 Locomotive - pulled the opening day train through the Woodhead Tunnel.

1847 The Manchester, Sheffield and Lincolnshire Railway (MS&LR) was formed, by amalgamation of the following lines:

1850 January 1st. The company appointed James Allport as manager.

1854 The company appointed Edward Watkin as Manager

1858 Planned to take a lease on the Warrington and Stockport Railway[1]

1865 Brassey and Co were appointed contractors[2]

1868 Engineer is Charles Sacre.[3]

1875 See 1875 Number of Locomotives where they are listed 6th with 374 locomotives.

1888 See Locomotive Stock June 1888 where they are listed 9th with 549 locomotives

1889 Consulting Engineer is Charles Sacre. Engineer of Permanent Ways is William Henry Stubbs. Loco, Carriage and Wagon Supt is Thomas Parker.[4]

1890 Alexander Ross became chief engineer

1893 Obtained Parliamentary approval for its so-called "Extension to London".

In the 1890s the M.S.& L.R. began construction of its "Derbyshire Lines", in effect the first part of its push southwards. Leaving its east-west main line at Beighton Junction, some 5.5 miles east of Sheffield, the line headed towards Nottingham, an opportunity to tap into the collieries in the north of county before reaching that city. A loop line was built to serve Chesterfield.

1895 Work on building the London Extension started: the new line was 92 miles in length. It ran from Annesley in Nottinghamshire to its connection with the existing Metropolitan Railway Extension at Quainton Road, this part of the line being jointly owned, returning to its own metals at Harrow for the final section to Marylebone.

1896 Charles Arthur Rowlandson appointed engineer-in-chief

1898 The London Extension opened for coal traffic on 25 July 1898; for passenger traffic on 15 March 1899, and for goods traffic on 11 April 1899.


1897 the company changed its name to the Great Central Railway. At the same time the headquarters of the Railway was moved from Manchester to London (Marylebone).

Locomotive Engineers

See Also

Loading...

Sources of Information

  1. The Times Jan. 15, 1858
  2. The Times, Jun 08, 1865
  3. 1868 Bradshaw's Railway Manual
  4. 1889 Bradshaw's Railway Manual